Critical Coordination Factors Affecting Design and Build Projects

A Comprehensive Review of the Literature

Authors

  • Misbah Mohamed Abdulwahed Ohag Faculty of Architecture, Lebanese International University, Yemen & Faculty of Engineering, Twintech University, Yemen & Architecture, College of Built Environment, Universiti Teknologi MARA, Shah Alam, Malaysia https://orcid.org/0000-0001-9896-0496
  • Abdul Hadi Hj. Nawawi Architecture, College of Built Environment, Universiti Teknologi MARA, Shah Alam, Malaysia https://orcid.org/0000-0002-4745-8751
  • Faudzi Muhammad Deputy Director (Talent Excellence), Competency and Career Enhancement Division, Department of Polytechnic and Community College Education, Ministry of Higher Education, Malaysia
  • Norfashiha Hashim Quantity Surveying, College of Built Environment, Universiti Teknologi MARA, Shah Alam, Malaysia https://orcid.org/0000-0003-4076-696X

DOI:

https://doi.org/10.26418/ijeas.2023.3.01.59-71

Keywords:

construction, coordination factors, design and build, project performance

Abstract

The design and build projects (DB) have increased in numbers in the last few decades. DB method is becoming more popular than the traditional method in Malaysia, especially in national projects.However, design-build projects may suffer from a significant number of problems, such as conflicts between the project parties (designers, contractors, and owners), resulting in poor performance and poor quality. One common cause of project failure of conventional projects is poor coordination and communication process. It has been found that no such study has been found to identify the coordination factors that might affect the project’s success. To fill this gap, this research aims to establish a framework of coordination factors affecting DB projects’ performance in Malaysia. This study uses a mixed methodology approach to identify critical coordination factors by a comprehensive review of the literature. The identified factors were categorized, ranked, and prioritized according to their influence on project performance using a quantitative approach. It is found that scheduling and planning, human resource coordination, documentation & records coordination, contract implementation coordination, value engineering and quality assurance, technical coordination, design coordination, management coordination, and external coordination are the significant factors of coordination that may affect the performance of construction projects. This study provides empirical evidence by correlating the identified coordination factors with DB project performance. Identification of coordination factors will help in enhancing and improving the performance of design and build projects.

Downloads

Download data is not yet available.

References

Abazid, M., Gökçekuş, H., & Çelik, T. (2019). Study of the Quality Concepts Implementation in the Construction of Projects in Saudi Arabia by Using Building Information Modelling (BIM). International Journal of Innovative Technology and Exploring Engineering, 8(3), 84–87.

Abbas, A., Din, Z. U., & Farooqui, R. (2016). Achieving Greater Project Success & Profitability through Pre-construction Planning: A Case-based Study. Procedia Engineering, 145, 804–811. https://doi.org/10.1016/j.proeng.2016.04.105

Ajayi, S. O., & Oyedele, L. O. (2018a). Critical Design Factors for Minimising Waste in Construction Projects: a Structural Equation Modelling Approach. Resources, Conservation and Recycling, 137, 302–313. https://doi.org/10.1016/j.resconrec.2018.06.005

Ajayi, S. O., & Oyedele, L. O. (2018b). Waste-Efficient Materials Procurement for Construction Projects: a Structural Equation Modelling of Critical Success Factors. Waste Management, 75, 60–69. https://doi.org/10.1016/j.wasman.2018.01.025

Al Nahyan, M. T., Sohal, A., Hawas, Y., & Fildes, B. (2019). Communication, Coordination, Decision-Making and Knowledge-Sharing: a Case Study in Construction Management. Journal of Knowledge Management, 23 (9), 1764-1781. https://doi.org/10.1108/JKM-08-2018-0503

Alaloul, W.S., Liew, M. S., & Zawawi, N. A. W. A. (2016). Identification of Coordination Factors Affecting Building Projects Performance. Alexandria Engineering Journal, 55(3), 2689–2698. https://doi.org/10.1016/j.aej.2016.06.010

Alaloul, W. S., Musarat, M. A., Liew, M. S., Qureshi, A. H., & Maqsoom, A. (2021). Investigating the Impact of Inflation on Labour Wages in Construction Industry of Malaysia. Ain Shams Engineering Journal, 12(2), 1575–1582. https://doi.org/10.1016/j.asej.2020.08.036

Amoah, P., Ahadzie, D., & Dansoh, A. (2011). The Factors Affecting Construction Performance in Ghana: The Perspective of Small-Scale Building Contractors. The Ghana Surveyor, 1, 41–49.

Azhar. A., Shahid. H., Zaigham. A., Zahoor. H., Syed Hussain. M., (2021). Analyzing the Impact of Coordination Factors on Construction Project Success in Pakistan Using Partial Least Squares Structural Equation Modeling. North American Academic Research (Naar) Journal, 4(1), 64-83 https://doi.org/10.5281/zenodo.4443028

Barrane, F. Z., Ndubisi, N. O., Kamble, S., Karuranga, G. E., & Poulin, D. (2021). Building Trust in Multi-Stakeholder Collaborations for New Product Development in the Digital Transformation Era. Benchmarking, 28(1), 205–228. https://doi.org/10.1108/BIJ-04-2020-0164

Chang, A. S., Shen, F.-Y., & Ibbs, W. (2010). Design and Construction Coordination Problems and Planning for Design–Build Project New Users. Canadian Journal of Civil Engineering, 37(12), 1525–1534. https://doi.org/10.1139/L10-090

Chen, Jin, Z., Xia, B., Wu, P., & Skitmore, M. (2016). Time and Cost Performance of Design–Build Projects. Journal of Construction Engineering and Management, 142(2), 04015074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056

Chen, Q., Adey, B. T., Haas, C. T., & Hall, D. M. (2021). Exploiting Digitalization for the Coordination of Required Changes to Improve Engineer-to-Order Materials Flow Management. Construction Innovation. https://doi.org/10.1108/CI-03-2020-0039

Cheng, M. Y., & Tsai, M. H. (2008). Cross-Organization Process Integration in Design-Build Team. Automation in Construction, 17(2), 151–162. https://doi.org/10.1016/j.autcon.2006.12.002

Construction Management Association of America. (2015). What are the Different Construction Delivery Types and Advantages of Each? https://pdf4pro.com/cdn/the-primer-what-are-the-different-construction-31ba9a.pdf

Dang, C. N., & Le-Hoai, L. (2017). Critical Success Factors for Implementation Process of Design-Build Projects in Vietnam. Journal of Engineering, Design and Technology, 14(1). https://doi.org/10.1108/JEDT-04-2013-0029

de Carvalho, M. M., Patah, L. A., & de Souza Bido, D. (2015). Project Management and Its Effects on Project Success: Cross-Country and Cross-Industry Comparisons. International Journal of Project Management, 33(7), 1509–1522. https://doi.org/10.1016/j.ijproman.2015.04.004

Ding, J., Wang, N., & Hu, L. (2018). Framework for Designing Project Delivery and Contract Strategy in Chinese Construction Industry Based on Value-Added Analysis. Advances in Civil Engineering, 2018, 1–14. https://doi.org/10.1155/2018/5810357

Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing Factors Affecting Delays in Indian Construction Projects. International Journal of Project Management, 30(4), 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004

El-Sabek, L. M., & McCabe, B. Y. (2018). Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East. International Journal of Construction Education and Research, 14(2), 118–140. https://doi.org/10.1080/15578771.2016.1276109

Enshassi, A., Mohamed, S., & Abushaban, S. (2010). Factors Affecting the Performance of Construction Projects in the Gaza Strip. Journal of Civil Engineering and Management, 15(3), 269–280. https://doi.org/10.3846/1392-3730.2009.15.269-280

Feghaly, J., El Asmar, M., Ariaratnam, S., & Bearup, W. (2021). Design–Build Project Administration Practices for the Water Industry. Journal of Pipeline Systems Engineering and Practice, 12(1), 04020068. https://doi.org/10.1061/(asce)ps.1949-1204.0000515

Hai, T., Yusof, A., Ismail, S., & Wei, L. (2012). A Conceptual Study of Key Barriers in Construction Project Coordination. Journal of Organizational Management Studies, 2012, 1–14. https://doi.org/10.5171/2012.795679

Hameed Memon, A., Rahman, I. A., Abdullah, M. R., Asmi, A., & Azis, A. (2014). Factors Affecting Construction Cost Performance in Project Management Projects: Case of MARA Large Projects. International Journal of Civil Engineering and Built Environment, 1(1), 2289–6317.

Kalach, M., Abdul-Malak, M.-A., & Srour, I. (2021). BIM-Enabled Streaming of Changes and Potential Claims Induced by Fast-Tracking Design-Build Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(1), 04520042. https://doi.org/10.1061/(asce)la.1943-4170.0000450

Kamaruddeen, A. M., Sung, C. F., & Wahi, W. (2020). A Study on Factors Causing Cost Overrun of Construction Projects in Sarawak, Malaysia. Civil Engineering and Architecture, 8(3), 191-199. https://doi.org/10.13189/cea.2020.080301

Kumar, D. (2016). Causes and Effects of Delays in Indian Construction Projects. International Research Journal of Engineering and Technology, 3(4), 2395–56. https://doi.org/10.1016/j.ijproman.2006.11.007

Latiffi, A.A., & Zulkiffli, N. A. (2021). Sustainable Construction Projects: The Level of Understanding on Leadership Skills among Project Managers. International Journal of Real Estate Studies, 15(1), 39–48. https://doi.org/10.11113/intrest.v15n1.7

Lee, Rahman, & Doh, S. I. (2020). Success Factors of Design-Build Public Sector Projects in Malaysia. IOP Conference Series: Materials Science and Engineering, 712(1). https://doi.org/10.1088/1757-899X/712/1/012045

Lee, Z. P., Rahman, R. A., & Doh, S. I. (2021). Critical Success Factors for Implementing Design-Build: Analysing Malaysian Public Projects. Journal of Engineering, Design and Technology. https://doi.org/10.1108/JEDT-08-2020-0321

Lu, W., Hua, Y. Y., & Zhang, S. J. (2017). Logistic Regression Analysis for Factors Influencing Cost Performance of Design-Bid-Build and Design-Build Projects. Engineering, Construction and Architectural Management, 24(1), 118–132. https://doi.org/10.1108/ECAM-07-2015-0119

Luo, L., He, Q., Jaselskis, E. J., & Xie, J. (2017). Construction Project Complexity: Research Trends and Implications. Journal of Construction Engineering and Management, 143(7), 04017019. https://doi.org/10.1061/(asce)co.1943-7862.0001306

Memon, A.H., Roslan, N., & Zainun, Y. Z. (2014). Improving Time Performance in Construction Project: Perspective of Constructor. Journal of American Science, 10(8), 46–50.

Moon, H., Kim, K., Lee, H.-S., Park, M., Williams, T. P., Son, B., & Chun, J.-Y. (2020). Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation Analysis. Journal of Construction Engineering and Management, 146(9), 04020113. https://doi.org/10.1061/(asce)co.1943-7862.0001873

Mutha, A., & Ghadge, A. (2018). Evaluating the Factors Affecting Quality of Residential Projects in Construction Industry. International Journal of Engineering Technology Science and Research, 5(4), 225–230.

Osmani, M. (2013). Design Waste Mapping: A Project Life Cycle Approach. Proceedings of Institution of Civil Engineers: Waste and Resource Management, 166(3), 114–127. https://doi.org/10.1680/warm.13.00013

Park, J., & Kwak, Y. H. (2017). Design-Bid-Build (DBB) vs. Design-Build (DB) in the U.S. Public Transportation Projects: The choice and consequences. International Journal of Project Management, 35(3), 280–295. https://doi.org/10.1016/J.IJPROMAN.2016.10.013

Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012). Time and Cost Performance of Costruction Projects in Southern and Cenrtal Regions of Penisular Malaysia. CHUSER 2012 - 2012 IEEE Colloquium on Humanities, Science and Engineering Research, Chuser, 52–57. https://doi.org/10.1109/CHUSER.2012.6504280

Razak, A. R. A., Othman, A. A., & Sundram, V. P. K. (2015). The Relationships of Human Success Factor, Information Technology, and Procurement Process Coordination on Operational Performance in Building Construction Industry – A Proposed Conceptual Framework. Procedia Economics and Finance, 31(15), 354–360. https://doi.org/10.1016/s2212-5671(15)01209-5

Renz, A., & Solas, M. Z. (2016). Shaping the Future of Construction A Breakthrough in Mindset and Technology. http://webcache.googleusercontent.com/search?q=cache:sDiMqd-dAZkJ:www3.weforum.org/docs/WEF_Shaping_the_Future_of_Construction_full_report__.pdf+&cd=5&hl=en&ct=clnk

Saaidin, Endut, I. R., Abu Samah, A. S., & Mohd Ridzuan, A. R. (2016). The Current Practice of Design and Build Procurement Process in Malaysia. Social and Management Research Journal, 13(2), 81. https://doi.org/10.24191/smrj.v13i2.5273

Said, J. (2021). Effect of Owner’s Factors on Project Delivery System Choices in the Downstream and Chemicals Sector. [Thesis, University of Wisconsin--Madison]. https://minds.wisconsin.edu/handle/1793/82222

Shahid, A., Ahmad, H., Ahmad, N., Shafique, M. N., & Amjad, N. (2015). Analysis of Key Performance Factors Affecting Residential Construction Projects in Pakistan. Arabian Journal of Business and Management Review (Nigerian Chapter), 3(10), 9–14.

Tabassi, A. A., Abdullah, A., & Bryde, D. J. (2019). Conflict Management, Team Coordination, and Performance Within Multicultural Temporary Projects: Evidence From the Construction Industry. Project Management Journal, 50(1), 101–114. https://doi.org/10.1177/8756972818818257

Tayeh, B. A., Al Hallaq, K., Alaloul, W. S., & Kuhail, A. R. (2018). Factors Affecting the Success of Construction Projects in Gaza Strip. The Open Civil Engineering Journal, 12(1), 301–315. https://doi.org/10.2174/1874149501812010301

Thunberg, M., Rudberg, M., & Gustavsson, T. K. (2017). Categorising on-Site Problems A Supply Chain Management Perspective on Construction Projects. Construction Innovation, 17(1), 90–111. https://doi.org/10.1108/CI-10-2015-0059

Townsend, R., & Gershon, M. (2020). Attaining Successful Construction Project Execution Through Personnel and Communication. Journal of Construction Engineering and Management, 146(9), 04020101. https://doi.org/10.1061/(asce)co.1943-7862.0001892

Urup, L. (2016). Integrated Design-Build Management: Studying Institutional Processes to Understand Project Coordination & Performance. [Thesis, Chalmers University of Technology] https://www.proquest.com/openview/bc931d2aa4f21429f23e5ae9fd96b049/1?pq-origsite=gscholar&cbl=51922&diss=y

Wong, & Soo. (2019). Factors Influencing Safety Performance in the Construction Industry. E-Bangi, 16(3), 1-9.

Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017). Investigating the Relationship Between Communication-Conflict Interaction and Project Success Among Construction Project Teams. International Journal of Project Management, 35(8), 1466–1482. https://doi.org/10.1016/j.ijproman.2017.08.006

Yap, Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting Critical Delay Factors for Construction: Analysing Projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717–1729. https://doi.org/10.1016/j.aej.2020.11.021

Yap, J. B. H., Chow, I. N., & Shavarebi, K. (2019). Criticality of Construction Industry Problems in Developing Countries: Analyzing Malaysian projects. Journal of Management in Engineering, 35(5). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000709

Yap, J.B.H., & Skitmore, M. (2018). Investigating Design Changes in Malaysian Building Projects. Architectural Engineering and Design Management, 14(3), 218–238. https://doi.org/10.1080/17452007.2017.1384714

Yap, J.B.H., Abdul-Rahman, H., Wang, C., & Skitmore, M. (2018). Exploring the Underlying Factors Inducing Design Changes During Building Production. Production Planning and Control, 7287, 1–16. https://doi.org/10.1080/09537287.2018.1448127

Yap, J.B.H., Leong, W. J., & Skitmore, M. (2020). Capitalising Teamwork for Enhancing Project Delivery and Management in Construction: Empirical Study in Malaysia. Engineering, Construction and Architectural Management, 27(7), 1479–1503. https://doi.org/10.1108/ECAM-10-2019-0581

Zidane, Y. J. T., & Andersen, B. (2018). The Top 10 Universal Delay Factors in Construction Projects. International Journal of Managing Projects in Business, 11(3), 650–672. https://doi.org/10.1108/IJMPB-05-2017-0052

Zulch, B., & Kitshoff, J.-P. (2021). The Role of the Project Manager in Delivering Design-Build Projects. In J. I. Kantola, S. Nazir, & V. Salminen (Eds.), Advances in Human Factors, Business Management and Leadership (Vol. 267, pp. 289–298). Springer International Publishing. https://doi.org/10.1007/978-3-030-80876-1_37

Downloads

Published

2023-02-28

How to Cite

Ohag, M., Nawawi, A. H., Muhammad, F., & Hashim, N. (2023). Critical Coordination Factors Affecting Design and Build Projects: A Comprehensive Review of the Literature. International Journal of Environment, Architecture, and Societies, 3(01), 59-71. https://doi.org/10.26418/ijeas.2023.3.01.59-71